Pyro
TD Admin
K so im not an engineer...obviously.
but it seems like the big issue they keep saying is it's so difficult because its a mile underwater.
okay and its a 20 inch pipe right? why cant they just build a mile long pipe thats like 22 inchs and then insert it on top of the one in the water.
then they could just cap it above the water and have the robots weld it shut overlapping with the broken tube.
does that not work?
but it seems like the big issue they keep saying is it's so difficult because its a mile underwater.
okay and its a 20 inch pipe right? why cant they just build a mile long pipe thats like 22 inchs and then insert it on top of the one in the water.
then they could just cap it above the water and have the robots weld it shut overlapping with the broken tube.
does that not work?